A look at recent work — a manufacturer whose bespoke configuration ran for days, now running in minutes, and the engineering underneath that made it possible.
// numbers are based on sales drawing lead time during busy periods and of three lift models automated, the respective times from automatic trigger to delivered to the sales person was between 7 mins and 9 mins for all but rare edge case requests.
Automation only runs reliably on robustly-built, parametric-ready models — so the sequence matters.
Find why configuration was slow — fragile models and a manual drawing process.
Restructure models and assemblies down to the sketch so they stay robust as parameters move.
Drive configuration and drawing generation with DriveWorks Pro — rules, not rework.
A repeatable pipeline the team runs themselves — days of work compressed to minutes.
“ .”
It starts with the same diagnosis behind every story here.